 ==== 3rd Week Report ==== ==== 3rd Week Report ====
  
-During the 3rd week, we determined our target, did research on our competitors and wrote the marketing brief. We also developed a questionnaire that we shared in several countries in view to guide us in what people really need. We also thought about the shape of the wearable UV meter (clip-on, bracelet,..) and started designing structural drafts. Finally we had two lessons of Technological Crash Course from Paulo Ferreira.+During the 3rd week, we determined our target, did research on our competitors and wrote the marketing brief. We also developed a questionnaire that we shared in several countries in view to guide us in what people really need. We also thought about the shape of the wearable UV meter (clip-on, bracelet,...) and started designing structural drafts. Finally we had two lessons of Technological Crash Course from Paulo Ferreira.
  
 ==== 4th Week Report ==== ==== 4th Week Report ====
  
-On Monday we had a deadline “black box”, we have uploaded our system diagram and our structural drafts to the wiki. For the communication class we also made a leaflet about our wearable UV meter. Further we thought more about our design and did more technical research (on UV sensors, Arduinos, etc).+On Monday we had a deadline “black box”, we have uploaded our system diagram and our structural drafts to the wiki. For the communication class we also made a leaflet about our wearable UV meter. Further we thought more about our design and did more technical research (on UV sensors, Arduinos, etc.).
  
 ==== 5th Week Report ==== ==== 5th Week Report ====
Line 56: Line 56:
 ==== 14th Week Report ==== ==== 14th Week Report ====
  
-We have programed more and started testing. In the end of the week the programing and components worked properly, but still we have to program a button and use everything on the bluno beetle and on the PCB board. The webpage, poster and leaflet are under development. Some short films to the movie have been made. +We have programmed more and started testing. In the end of the week the programming and components worked properly, but still we have to program a button and use everything on the Bluno Beetle and on the PCB board. The webpage, poster and leaflet are under development. Some short films to the movie have been made.  
 + 
 +==== 15th Week Report ==== 
 +We finished the last things on our prototype and uploaded all the deliverables. On Thursday we had our final presentation and the individual assessments. 
 + 
 +==== 16th Week Report ==== 
 +We applied the suggestions of the teachers and supervisors and uploaded our refined deliverables, we also put all the deliverables on a CD and handed it in. The closing session was on Thursday, we got our certificate and had lunch with everybody! 
 ===== Meetings ===== ===== Meetings =====
  
Line 227: Line 234:
        * Second option is just to reduce the quantity of LED lights to four on our prototype.        * Second option is just to reduce the quantity of LED lights to four on our prototype.
        * Cork piece.          * Cork piece.  
 +
 === Minute: === === Minute: ===
  
 +The supervisors will check if they have a DVD to put the deliverables on. The flowchart needs to be remade, because it was not a flowchart. The supervisors will come and help with the pin problem, after the meeting. We got information about next thursday when we have the presentation, examples on how to act and not act when presenting. Things that have to be printed out: report, flyer and the poster. 
 ===== Activities ===== ===== Activities =====
  
QR Code
QR Code log (generated for current page)